{"data":{"id":"us/33-cfr-117.1091","jurisdiction":"us","citation":"33 CFR 117.1091","heading":"Menomonee River.","body":"The draw of the Ogden-First Street bridge, mile 0.4 at Marinette, shall open on signal from 7 a.m. to 11 p.m. from May 1 through October 31. From 11 p.m. to 7 a.m. from May 1 through October 31, the draw shall open on signal if at least two hours notice is given. From November 1 through April 30, the draw shall open on signal if at least 12 hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"a023f1bff58580bd54fe319ae9c500c379943a715f8785d0aa022961000d7d16","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.1089","next":"us/33-cfr-117.1093"},"notice":"GroundRules: Original legal text. Not legal advice."}
