{"data":{"id":"us/33-cfr-117.179","jurisdiction":"us","citation":"33 CFR 117.179","heading":"Newark Slough.","body":"The draw of the San Mateo County Transportation Department railroad bridge, mile 0.5 near Newark, shall open on signal if at least 24 hours notice is given to the San Mateo Transportation Department, at San Carlos.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"72263cdfab2b1562ddc33368967e00f4a804e328304439215f5ead978acc8920","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.177","next":"us/33-cfr-117.181"},"notice":"GroundRules: Original legal text. Not legal advice."}
