{"data":{"id":"us/33-cfr-117.197","jurisdiction":"us","citation":"33 CFR 117.197","heading":"Sonoma Creek.","body":"The draw of the Northwestern Pacific railroad bridge, mile 5.4 at Wingo, shall open on signal if at least 24 hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"52fb3f0b427d08406405ee555420692a19e02ba05ca657169afcbd46f8819409","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.195","next":"us/33-cfr-117.199"},"notice":"GroundRules: Original legal text. Not legal advice."}
