{"data":{"id":"us/33-cfr-117.307","jurisdiction":"us","citation":"33 CFR 117.307","heading":"Miami River, North Fork.","body":"The draw of the FDOT Railroad Bridge, mile 5.3 at Miami, shall open on signal if at least 48-hour notice is given to CSX System Operating Headquarters (800) 232-0144.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"87dae636e6c3a549c04dbbb78903633700677ecfd6d2c739ed5a0b36031deedc","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.305","next":"us/33-cfr-117.307t"},"notice":"GroundRules: Original legal text. Not legal advice."}
