{"data":{"id":"us/33-cfr-117.329","jurisdiction":"us","citation":"33 CFR 117.329","heading":"St. Marys River.","body":"The draws of US17 bridge, mile 23.0, and the Seaboard System Railroad bridge, mile 23.1, both at Kingsland, shall open on signal if at least 48 hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"f4f64176797a610ecdcd4805a223d93801f350e1eda80e49d47cf88379137ce1","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.325","next":"us/33-cfr-117.331"},"notice":"GroundRules: Original legal text. Not legal advice."}
