{"data":{"id":"us/33-cfr-117.381","jurisdiction":"us","citation":"33 CFR 117.381","heading":"Clearwater River.","body":"The draws of the Camas Prairie railroad bridge, mile 0.6 at Lewiston, shall open on signal if at least three hours notice is given to the Camas Prairie Railroad in Lewiston.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"131e49e93f6993bc0d85f0e695122ceff5f36876ebdd9693b99f77bd977855e2","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.373","next":"us/33-cfr-117.383"},"notice":"GroundRules: Original legal text. Not legal advice."}
