{"data":{"id":"us/33-cfr-117.480","jurisdiction":"us","citation":"33 CFR 117.480","heading":"Mermentau River.","body":"The draw of the S82 bridge, mile 7.1 at Grand Chenier, shall open on signal; except that, from 6 p.m. to 6 a.m. the draw shall open on signal if at least 4 hours notice is given. During the advance notice period, the draw will open on less than 4 hours notice for an emergency and will open on demand should a temporary surge in waterway traffic occur.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"358198e1c8938e96e5afa2ab07ffcf8205adfbba9556a6abea2b855a630f6e4b","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.478","next":"us/33-cfr-117.481"},"notice":"GroundRules: Original legal text. Not legal advice."}
