{"data":{"id":"us/33-cfr-117.497","jurisdiction":"us","citation":"33 CFR 117.497","heading":"Stumpy Bayou.","body":"The removable span of the Louisiana highway bridge, mile 1.0 near Weeks Island, shall be removed for the passage of vessels if at least six days notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"d08daf89ee5afdc798c902e8a286a35fa6aaed6008927a8d7c747016c87a4ae5","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.494","next":"us/33-cfr-117.500"},"notice":"GroundRules: Original legal text. Not legal advice."}
