{"data":{"id":"us/33-cfr-117.503","jurisdiction":"us","citation":"33 CFR 117.503","heading":"Tensas River.","body":"The draw of the S15 bridge, mile 27.3 at Clayton shall open on signal if at least 48 hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"adb3c717d98e8bf3b1fd872a091f4dd6db76089366d1e52882f704abf113bbc5","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.501","next":"us/33-cfr-117.505"},"notice":"GroundRules: Original legal text. Not legal advice."}
