{"data":{"id":"us/33-cfr-117.511","jurisdiction":"us","citation":"33 CFR 117.511","heading":"West Pearl River.","body":"The draw of the US 90 bridge, mile 7.9 near Pearlington, shall open on signal if at least four hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"d93d90e9c839815dc5b8442558b448bf7e70e66d4ce9a491ea5ae3c764e01584","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.509","next":"us/33-cfr-117.523"},"notice":"GroundRules: Original legal text. Not legal advice."}
