{"data":{"id":"us/33-cfr-117.533","jurisdiction":"us","citation":"33 CFR 117.533","heading":"Sheepscot River.","body":"The draw of the Maine Central Railroad Bridge, mile 15.0, between Wiscasset and North Edgecombe, Maine, need not be opened for the passage of vessels. The draw of the Maine Central Railroad Bridge shall be returned to operable condition within six months after notification by the District Commander to do so.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"d0561eb1a6c5eac8c965f051c5ea27749f06e06f3110b771b9a382f4139fb58f","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.531","next":"us/33-cfr-117.537"},"notice":"GroundRules: Original legal text. Not legal advice."}
