{"data":{"id":"us/33-cfr-117.537","jurisdiction":"us","citation":"33 CFR 117.537","heading":"Townsend Gut.","body":"The draw of the Southport (SR27) Bridge, at mile 0.7, across Townsend Gut between Boothbay Harbor and Southport, Maine shall open on signal; except that, from April 29 through September 30, between 6 a.m. and 6 p.m., the draw shall open on signal on the hour and half hour only, after an opening request is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"05540ded4bf7d347f640a629ca252ebc497f10190abbd9ea4460ead185c93ab0","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.533","next":"us/33-cfr-117.543"},"notice":"GroundRules: Original legal text. Not legal advice."}
