{"data":{"id":"us/33-cfr-117.731","jurisdiction":"us","citation":"33 CFR 117.731","heading":"Mullica River.","body":"The draws of the bridges listed in this section shall open on signal, except as follows:\n(a) The draw of the Lower Bank bridge, mile 15.0, need not open during the following periods unless at least four hours notice is given:\n(1) From May 1 through November 30, from 11 p.m. to 7 a.m.\n(2) From December 1 through April 30, at all times.\n(b) The draw of the Green Bank bridge, mile 18.0, need not open unless at least four hours notice is given during the following periods:\n(1) April 1 through November 30, from 11 p.m. to 7 a.m.\n(2) December 1 through March 31, at all times.\n(c) The drawspan must open as soon as possible for public vessels of the United States during the periods when four hours notice is required.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"024de2cc8346b82c411879b1cc94a342c43d45360f51bbf5db19049686b56671","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.729","next":"us/33-cfr-117.733"},"notice":"GroundRules: Original legal text. Not legal advice."}
