{"data":{"id":"us/33-cfr-117.850","jurisdiction":"us","citation":"33 CFR 117.850","heading":"Black River.","body":"(a) The Charles Berry Bridge, mile 0.6, will open on signal, except from January 1 through March 31 when the bridge will open if a 12-hour advance notice is given. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.\n(b) The Norfolk Southern Railroad Bridge, mile 1.2, will open on signal, except from January 1 through March 31 when the bridge will open if a 12-hour advance notice is given. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"70a552583130c11ff5903dc408718993289fb02e8b8713ff009cb5fa0a8ef4d9","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.849","next":"us/33-cfr-117.851"},"notice":"GroundRules: Original legal text. Not legal advice."}
