{"data":{"id":"us/33-cfr-117.855","jurisdiction":"us","citation":"33 CFR 117.855","heading":"Maumee River.","body":"(a) The draw of the CSX Railroad Bridge, mile 1.07, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.\n(b) The draw of the Wheeling and Lake Erie Railroad Bridge, mile 1.80, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio.\n(c) The draw of the Craig Memorial Bridge, mile 3.30, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio.\n(d) The draw of the Martin Luther King Jr Memorial Bridge, mile 4.30, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio.\n(e) The draw of the Norfolk Southern Railroad Bridge, mile 5.76, will open on signal, except that from December 15 through March 31 the bridge will require at least 12-hours advance notice. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"22e9be6a89e0ddea81cacb1d6d12b46b6d35bdd2bbd709403f80c89a378495eb","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.853","next":"us/33-cfr-117.861"},"notice":"GroundRules: Original legal text. Not legal advice."}
