{"data":{"id":"us/33-cfr-117.887","jurisdiction":"us","citation":"33 CFR 117.887","heading":"Oregon Slough (North Portland Harbor).","body":"The draw of the Burlington Northern Santa Fe railroad bridge, mile 3.2 at Portland, shall open on signal if at least one half hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"dc4cdaca29cec69c2a3e072c34c062a9866c69d2c10f10bcbbc2fb752744a9a2","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.881","next":"us/33-cfr-117.889"},"notice":"GroundRules: Original legal text. Not legal advice."}
