{"data":{"id":"us/33-cfr-117.925","jurisdiction":"us","citation":"33 CFR 117.925","heading":"Cooper River.","body":"The draw of the Seaboard System Railroad bridge, mile 42.8 near Cordesville, shall open on signal if at least six hours advance notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"121fef72387e1df1de88dcfde11a10f59647f5e4dd6be15181e7145a98be9303","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.923","next":"us/33-cfr-117.929"},"notice":"GroundRules: Original legal text. Not legal advice."}
