{"data":{"id":"us/33-cfr-117.951","jurisdiction":"us","citation":"33 CFR 117.951","heading":"Arroyo Colorado River.","body":"The draw of the S106 highway bridge, mile 22.5 at Rio Hondo, shall open on signal if at least 12 hours notice is given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"7ff276c0b0c9309e4b449163f9a074391aa21c79ad280578c6f8317edb3ccfa1","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.949","next":"us/33-cfr-117.953"},"notice":"GroundRules: Original legal text. Not legal advice."}
