{"data":{"id":"us/33-cfr-117.955","jurisdiction":"us","citation":"33 CFR 117.955","heading":"Buffalo Bayou.","body":"The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours' notice if given.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"464cb2ba048c4c3a225a4bb8304fe517a42644c95f3d2aae4e0a97be2b3bb9b2","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.953","next":"us/33-cfr-117.959"},"notice":"GroundRules: Original legal text. Not legal advice."}
