{"data":{"id":"us/33-cfr-117.995","jurisdiction":"us","citation":"33 CFR 117.995","heading":"Appomattox River.","body":"The draw of the Seaboard System Railroad bridge, mile 2.5 at Hopewell, shall open on signal if at least 24 hours notice is given to the Seaboard System Agent at Hopewell. However, a drawtender shall be in constant attendance and the draw shall open on signal upon 30 days notice, in writing, to do so from the District Commander.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"5c96b321b8c3c5bd472de4e6212fcd4da794433a5e67aebb0b8cf3ed88b7132d","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.993","next":"us/33-cfr-117.997"},"notice":"GroundRules: Original legal text. Not legal advice."}
