{"data":{"id":"us/33-cfr-127.305","jurisdiction":"us","citation":"33 CFR 127.305","heading":"Operations Manual.","body":"Each Operations Manual must contain—\n(a) A description of the transfer system including mooring areas, transfer connections, control rooms, and diagrams of the piping and electrical systems;\n(b) The duties of each person assigned for transfer operations;\n(c) The maximum relief valve setting or maximum allowable working pressure of the transfer system;\n(d) The facility telephone numbers of facility supervisors, persons in charge of shoreside transfer operations, personnel on watch in the marine transfer area for LNG, and security personnel;\n(e) A description of the security systems for the marine transfer area for LNG;\n(f) The procedures for—\n(1) Transfer operations including gauging, cool down, pumping, venting, and shutdown;\n(2) Transfer operations start-up and shutdown;\n(3) Security violations; and\n(4) The communications systems; and\n(g) A description of the training programs established under § 127.503.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER L—WATERFRONT FACILITIES","PART 127—WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS","Subpart B—Waterfront Facilities Handling Liquefied Natural Gas"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"f4c9cb7519f3aa558eb633a3c4394d5385804bef71f7ce8f76edff1d7f1d30a2","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-127.303","next":"us/33-cfr-127.307"},"notice":"GroundRules: Original legal text. Not legal advice."}
