{"data":{"id":"us/33-cfr-146.10","jurisdiction":"us","citation":"33 CFR 146.10","heading":"Notice of new facilities.","body":"(a) The owner or operator of each OCS facility not in operation before April 5, 1982 shall, at least 30 days before the date on-site construction of the facility is expected to commence, notify the District Commander for the area in which the facility will be located of:\n(1) The position in which the facility will be operated;\n(2) The designation assigned to the facility for identification under 30 CFR 250.37;\n(3) The date when operation of the facility is expected to commence; and\n(4) The date when the facility is expected to be available for inspection by the Coast Guard.\n(b) The information required in paragraph (a) of this section may be submitted together with a need not repeat information submitted in connection with the application and notice requirements in 33 CFR part 67 for aids to navigation on the Outer Continental Shelf.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER N—OUTER CONTINENTAL SHELF ACTIVITIES","PART 146—OPERATIONS","Subpart A—OCS Facilities"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"f54c43292a39e9ddf5725c00d31fe3bcea1f444c67ae0cff324c8638c9746b60","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-146.5","next":"us/33-cfr-146.15"},"notice":"GroundRules: Original legal text. Not legal advice."}
