{"data":{"id":"us/33-cfr-154.2010","jurisdiction":"us","citation":"33 CFR 154.2010","heading":"Qualifications for acceptance as a certifying entity.","body":"To qualify for acceptance as a vapor control system (VCS) certifying entity, the entity must demonstrate to the satisfaction of the Commandant that it possesses the following minimum qualifications:\n(a) The ability to review and evaluate design drawings and failure analyses for compliance to this subpart;\n(b) The knowledge of the applicable regulations of this subpart, including the standards incorporated by reference;\n(c) The ability to monitor and evaluate test procedures and results for compliance with the operational requirements of this subpart;\n(d) The ability to perform inspections and observe tests of bulk liquid cargo-handling systems;\n(e) The applicant must not be controlled by an owner or operator of a vessel or facility engaged in controlling vapor emissions;\n(f) The applicant must not be dependent upon Coast Guard acceptance under this section to remain in business; and\n(g) The person in charge of VCS certification must be a licensed professional engineer in a U.S. State or territory. A person in charge of VCS certification who is not a licensed professional engineer on August 15, 2013 must obtain that license from a U.S. State or territory by August 15, 2014.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER O—POLLUTION","PART 154—FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK","Subpart P—Marine Vapor Control Systems"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"1afe762044f18c7c0027febd9264de7d2749754f5ae8789c5398030b0a688859","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-154.2001","next":"us/33-cfr-154.2011"},"notice":"GroundRules: Original legal text. Not legal advice."}
