{"data":{"id":"us/33-cfr-155.1135","jurisdiction":"us","citation":"33 CFR 155.1135","heading":"Response plan development and evaluation criteria.","body":"For tankers subject to this subpart, the following response times must be used in determining the on-scene arrival time in Prince William Sound, for the response resources required by § 155.1050:\nTier 1 Tier 2 Tier 3\nPrince William Sound 12 hrs 24 hrs 36 hrs","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER O—POLLUTION","PART 155—OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS","Subpart E—Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"b278cd8fd63a29c82afc421b17b1a9ac80984c2352c91a90627bd8143bff31bc","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-155.1130","next":"us/33-cfr-155.1145"},"notice":"GroundRules: Original legal text. Not legal advice."}
