{"data":{"id":"us/33-cfr-155.1150","jurisdiction":"us","citation":"33 CFR 155.1150","heading":"Plan revision and amendment procedures.","body":"An appendix prepared and submitted under this subpart must be revised and amended, as necessary, in accordance with § 155.1070.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER O—POLLUTION","PART 155—OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS","Subpart E—Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"898e8b43573abe9bfbef5e4d8dffc1b85fef82bf123826ffe1298bced919a910","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-155.1145","next":"us/33-cfr-155.1210"},"notice":"GroundRules: Original legal text. Not legal advice."}
