{"data":{"id":"us/33-cfr-155.5070","jurisdiction":"us","citation":"33 CFR 155.5070","heading":"Procedures for plan review, revision, and amendment.","body":"(a) The owner or operator of a nontank vessel must review the vessel response plan (VRP) annually. This review must occur within 1 month of the anniversary date of Coast Guard approval of the VRP.\n(b) A VRP prepared and submitted under this subpart must be revised and amended, as necessary, in accordance with § 155.1070.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER O—POLLUTION","PART 155—OIL OR HAZARDOUS MATERIAL POLLUTION PREVENTION REGULATIONS FOR VESSELS","Subpart J—Nontank Vessel Response Plans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"4e43098a104dc0c2039b5ceeb284b285f6d98c1f7cbb22051e643d9067a2814e","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-155.5067","next":"us/33-cfr-155.5075"},"notice":"GroundRules: Original legal text. Not legal advice."}
