{"data":{"id":"us/33-cfr-230.2","jurisdiction":"us","citation":"33 CFR 230.2","heading":"Applicability.","body":"This regulation is applicable to the U.S. Army Corps of Engineers Civil Works program, except the permitting programs and the 33 U.S.C. 408 request for permission program covered in 33 CFR part 333.","path":["Title 33—Navigation and Navigable Waters","CHAPTER II—CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE","PART 230—PROCEDURES FOR IMPLEMENTING NEPA"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"4f94e815027c1e3f0ae81a08e095b0f03ff05698c7977c31250fc21c3d12f063","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-230.1","next":"us/33-cfr-230.3-230.8"},"notice":"GroundRules: Original legal text. Not legal advice."}
