{"data":{"id":"us/33-cfr-245.15","jurisdiction":"us","citation":"33 CFR 245.15","heading":"Delegation.","body":"District Engineers may undertake removal without prior approval of the Chief of Engineers provided the cost does not exceed $100,000. Removals estimated to cost above $100,000 require advance approval of the Director of Civil Works.","path":["Title 33—Navigation and Navigable Waters","CHAPTER II—CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE","PART 245—REMOVAL OF WRECKS AND OTHER OBSTRUCTIONS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"b86928da9f27bcb3ad7de2dc84fa09e8703fd683a843b7caac45a99a51fc63ef","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-245.10","next":"us/33-cfr-245.20"},"notice":"GroundRules: Original legal text. Not legal advice."}
