{"data":{"id":"us/33-cfr-402.13","jurisdiction":"us","citation":"33 CFR 402.13","heading":"Operational surcharges—no postponements.","body":"Item Column 1 Place in Montreal-Lake Ontario section Column 2 Period after clearance date Column 3 Amount ($) (5 locks) 1\n(a) Cape Vincent (downbound) or Cap Saint-Michel (upbound) (a) 24 hours (b) 24 hours or more but less than 48 hours (c) 48 hours or more but less than 72 hours (d) 72 hours or more but less than 96 hours 20,000 40,000 60,000 80,000\n(b) Port, dock or wharf within St. Lambert—Iroquois lock segment (a) 24 hours (b) 24 hours or more but less than 48 hours (c) 48 hours or more but less than 72 hours (d) 72 hours or more but less than 96 hours n/a 20,000 40,000 60,000\n1 Prorated on a per-lock basis.","path":["Title 33—Navigation and Navigable Waters","CHAPTER IV—GREAT LAKES ST. LAWRENCE SEAWAY DEVELOPMENT CORPORATION, DEPARTMENT OF TRANSPORTATION","PART 402—TARIFF OF TOLLS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"1935dfff50e5cae9b90d2cc2ee02a47bc88e2c9f2553884894a7f418cf7abf50","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-402.12","next":"us/33-cfr-402.14"},"notice":"GroundRules: Original legal text. Not legal advice."}
