{"data":{"id":"us/34-cfr-75.531","jurisdiction":"us","citation":"34 CFR 75.531","heading":"Limit on total cost of a project.","body":"A grantee shall ensure that the total cost to the Federal Government is not more than the amount stated in the notification of grant award.","path":["Title 34—Education","Subtitle A—Office of the Secretary, Department of Education","PART 75—DIRECT GRANT PROGRAMS","Subpart E—What Conditions Must Be Met by a Grantee?"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-34.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:40Z","sha256":"05a2cf53968eefc8f8f7075b3af08ae9ba63b0f25f06959cb52c94944dbd0e8d","source_id":"us-cfr","stale":true,"prev":"us/34-cfr-75.530","next":"us/34-cfr-75.532"},"notice":"GroundRules: Original legal text. Not legal advice."}
