{"data":{"id":"us/34-cfr-75.601","jurisdiction":"us","citation":"34 CFR 75.601","heading":"Approval of the construction.","body":"(a) The Secretary approves a direct grantee construction project—\n(1) When the initial grant application is approved; or\n(2) After the grant has been awarded.\n(b) A grantee may not advertise or place the construction project on the market for bidding until after the Secretary has approved the project.","path":["Title 34—Education","Subtitle A—Office of the Secretary, Department of Education","PART 75—DIRECT GRANT PROGRAMS","Subpart E—What Conditions Must Be Met by a Grantee?"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-34.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:40Z","sha256":"800e878fa819bd2eb074e0b2c6c0d466ab40b9bbe8deeaf92b7c778236fc1e90","source_id":"us-cfr","stale":true,"prev":"us/34-cfr-75.600","next":"us/34-cfr-75.602"},"notice":"GroundRules: Original legal text. Not legal advice."}
