{"data":{"id":"us/34-cfr-75.605","jurisdiction":"us","citation":"34 CFR 75.605","heading":"After the construction.","body":"(a) A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.\n(b) A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.\n(c) A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with 2 CFR 200.334.","path":["Title 34—Education","Subtitle A—Office of the Secretary, Department of Education","PART 75—DIRECT GRANT PROGRAMS","Subpart E—What Conditions Must Be Met by a Grantee?"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-34.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:40Z","sha256":"dbb04d24635111b23228d463ec54ddcf5f51f5bfc23bfeeef10da88316d13789","source_id":"us-cfr","stale":true,"prev":"us/34-cfr-75.604","next":"us/34-cfr-75.606"},"notice":"GroundRules: Original legal text. Not legal advice."}
