{"data":{"id":"us/36-cfr-1010.6","jurisdiction":"us","citation":"36 CFR 1010.6","heading":"Determination of requirement for EA or EIS.","body":"In deciding whether to require the preparation of an EA or an EIS, the NEPA Compliance Coordinator will determine whether the proposal is one that:\n(a) Normally does not require either an EA or an EIS;\n(b) Normally requires an EIS; or\n(c) Normally requires an EA, but not necessarily an EIS.","path":["Title 36—Parks, Forests, and Public Property","CHAPTER X—PRESIDIO TRUST","PART 1010—ENVIRONMENTAL QUALITY"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-36.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:44Z","sha256":"b5a0abaf79cb61743ade22af8981aa8ccda287fa63f4ebede5f26156b68cc38c","source_id":"us-cfr","stale":true,"prev":"us/36-cfr-1010.5","next":"us/36-cfr-1010.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
