{"data":{"id":"us/36-cfr-51.19","jurisdiction":"us","citation":"36 CFR 51.19","heading":"Must the Director award the concession contract that is set forth in the prospectus?","body":"Except for incorporating into the concession contract appropriate elements of the best proposal, the Director must not award a concession contract which materially amends or does not incorporate the terms and conditions of the concession contract as set forth in the prospectus.","path":["Title 36—Parks, Forests, and Public Property","CHAPTER I—NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR","PART 51—CONCESSION CONTRACTS","Subpart C—Solicitation, Selection and Award Procedures"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-36.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:44Z","sha256":"d982bd1878da7a012d319726ed1de23e8b65e5756d199f0ede3caa8bf26355a6","source_id":"us-cfr","stale":true,"prev":"us/36-cfr-51.18","next":"us/36-cfr-51.20"},"notice":"GroundRules: Original legal text. Not legal advice."}
