{"data":{"id":"us/36-cfr-9.62","jurisdiction":"us","citation":"36 CFR 9.62","heading":"When will the NPS grant a temporary access permit?","body":"If the Regional Director determines that your proposed reconnaissance surveys will not result in surface disturbance, except for minimal disturbance necessary to perform required surveys, the Regional Director will issue you a temporary access permit within 30 days after receipt of a complete application, unless the Regional Director notifies you that additional time is necessary to evaluate or process your application.","path":["Title 36—Parks, Forests, and Public Property","CHAPTER I—NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR","PART 9—MINERALS MANAGEMENT","Subpart B—Non-Federal Oil and Gas Rights"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-36.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:44Z","sha256":"5e6ead4d1eed6e5c8ec0c5adef43eb2c7a4ac0b9c11d7bf1ebbb279749a1cd2f","source_id":"us-cfr","stale":true,"prev":"us/36-cfr-9.61","next":"us/36-cfr-9.63"},"notice":"GroundRules: Original legal text. Not legal advice."}
