{"data":{"id":"us/36-cfr-9.90","jurisdiction":"us","citation":"36 CFR 9.90","heading":"What additional information must be included if I am proposing production operations?","body":"If you are proposing production operations, you must submit the following information:\n(a) The dimensions with a to-scale layout of the wellpad, clearly identifying well locations, noting partial reclamation areas; gathering, separation, metering, and storage equipment; electrical lines; fences; spill control equipment or structures including lined areas, artificial lift equipment, tank batteries, treating and separating vessels, secondary or enhanced recovery facilities, water disposal facilities, gas compression and/or injection facilities; metering points; sales point (if on lease); tanker pick-up points; gas compressor, including size and type (if applicable); and any other well site equipment;\n(b) The size, grade, weight, and setting depth of all casing and tubing strings; cementing history; type and size of packers and subsurface flow control devices; top and bottom depths of each completed interval; and method of completion;\n(c) The well history, including completions, stimulations, servicing, and workovers;\n(d) The minimum specifications for pressure-control equipment, function, and pressure-testing frequency;\n(e) The methods and means to be used to transport produced oil and gas, including vehicular transport; flowline and gathering line construction; operation; pipe size; operating pressure; cathodic protection methods; surface equipment use; surface equipment location; maintenance procedures; maintenance schedules; pressure detection methods; and shutdown procedures;\n(f) Road and wellpad maintenance plan, including equipment and materials to maintain the road surface and control erosion;\n(g) Vegetation management plan on well sites, roads, pipeline corridors, and other disturbed surface areas, including control of exotic species;\n(h) Storm water management plan on the well site;\n(i) Produced water storage and disposal plan; and\n(j) The procedures for well plugging, the depths and the types of plugs, and minimum mud weight.","path":["Title 36—Parks, Forests, and Public Property","CHAPTER I—NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR","PART 9—MINERALS MANAGEMENT","Subpart B—Non-Federal Oil and Gas Rights"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-36.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:44Z","sha256":"258f8362564bfa9559800a5ea2d8d23be9c3f4960212b88818bc281665227c91","source_id":"us-cfr","stale":true,"prev":"us/36-cfr-9.89","next":"us/36-cfr-9.100"},"notice":"GroundRules: Original legal text. Not legal advice."}
