{"data":{"id":"us/38-cfr-39.120","jurisdiction":"us","citation":"38 CFR 39.120","heading":"Documentation of grant accomplishments.","body":"Within 60 days of completion of an Operation and Maintenance Project, the State or Tribal Organization must submit to VCGS a written report regarding the work performed to meet VA's national shrine standards. This report must be based on the original justification for the grant as noted in § 39.81(b)(10) and must include statistical data and detailed pictures of the work accomplished.","path":["Title 38—Pensions, Bonuses, and Veterans' Relief","CHAPTER I—DEPARTMENT OF VETERANS AFFAIRS","PART 39—AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES","Subpart D—Grant Recipient Responsibilities, Inspections, and Reports Following Project Completion"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-38.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:50Z","sha256":"e1224fc3b52f13c5c97b6794ec6e9e3956cd73660358badacac8791823a1d5e3","source_id":"us-cfr","stale":true,"prev":"us/38-cfr-39.102-39.119","next":"us/38-cfr-39.121"},"notice":"GroundRules: Original legal text. Not legal advice."}
