{"data":{"id":"us/39-cfr-776.8","jurisdiction":"us","citation":"39 CFR 776.8","heading":"Scope.","body":"(a) The regulations in this subpart are applicable to the following proposed postal facility actions located in a wetland:\n(1) New construction, owned or leased; or\n(2) Construction projects at an existing facility that would alter the external configuration of the facility.\n(b) These procedures are not applicable to the following postal facility actions:\n(1) Construction of foot and bike trails, or boardwalks, including signs, the primary purposes of which are public education, interpretation, or enjoyment of wetland resources;\n(2) Construction at existing postal facilities pursuant to the Architectural Barriers Act or postal accessibility standards;\n(3) Any facility construction project deemed necessary to comply with federal, state, or local health, sanitary, or safety code standards to ensure safe working conditions;\n(4) Construction of facilities that are functionally dependent on water, such as piers, docks, or boat ramps; or\n(5) Maintenance, repair, or renovation of existing facilities.","path":["Title 39—Postal Service","CHAPTER I—UNITED STATES POSTAL SERVICE","SUBCHAPTER K—ENVIRONMENTAL REGULATIONS","PART 776—FLOODPLAIN AND WETLAND PROCEDURES","Subpart C—Wetlands Protection"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-39.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:51Z","sha256":"09b38f23ed45379c9b8012ebb195e540cbdaffd177e5d4e998fc24f399322b29","source_id":"us-cfr","stale":true,"prev":"us/39-cfr-776.7","next":"us/39-cfr-776.9"},"notice":"GroundRules: Original legal text. Not legal advice."}
