{"data":{"id":"us/40-cfr-147.3010","jurisdiction":"us","citation":"40 CFR 147.3010","heading":"Mechanical integrity tests.","body":"The monitoring of annulus pressure listed in § 146.8(b)(1) of this chapter will only be acceptable if preceded by a pressure test, using liquid or gas that clearly demonstrates that mechanical integrity exists at the time of the pressure test.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER D—WATER PROGRAMS","PART 147—STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS","Subpart HHH—Lands of the Navajo, Ute Mountain Ute, and All Other New Mexico Tribes"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"2283141ab6c293d6eb09ed9c0e651a3f9cd2ef062b70307848197778a5716e5a","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-147.3009","next":"us/40-cfr-147.3011"},"notice":"GroundRules: Original legal text. Not legal advice."}
