{"data":{"id":"us/40-cfr-147.3107","jurisdiction":"us","citation":"40 CFR 147.3107","heading":"Mechanical integrity.","body":"(a) Monitoring of annulus pressure conducted pursuant to § 146.8(b)(1) shall be preceded by an initial pressure test. A positive gauge pressure on the casing/tubing annulus (filled with liquid) shall be maintained continuously. The pressure shall be monitored monthly.\n(b) Pressure tests conducted pursuant to § 146.8(b)(2) of this chapter shall be performed with a pressure on the casing/tubing annulus of at least 200 p.s.i. unless otherwise specified by the Director. In addition, pressure tests conducted during well operation shall maintain an injection/annulus pressure differential of at least 100 p.s.i. throughout the tubing length.\n(c) Monitoring of enhanced recovery wells conducted pursuant to § 146.8(b)(3), must be preceded by an initial pressure test that was conducted no more than 90 days prior to the commencement of monitoring.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER D—WATER PROGRAMS","PART 147—STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS","Subpart III—Lands of Certain Oklahoma Indian Tribes"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"d1cf695653c555d46bda572660000d9e834233c0afb790a5a13d8412489a954b","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-147.3106","next":"us/40-cfr-147.3108"},"notice":"GroundRules: Original legal text. Not legal advice."}
