{"data":{"id":"us/40-cfr-262.255","jurisdiction":"us","citation":"40 CFR 262.255","heading":"Required aisle space.","body":"The large quantity generator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control equipment, and decontamination equipment to any area of facility operation in an emergency, unless aisle space is not needed for any of these purposes.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER I—SOLID WASTES","PART 262—STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE","Subpart M—Preparedness, Prevention, and Emergency Procedures for Large Quantity Generators"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"1c17eadd7fb1abb418e1f968f9356299147bbf5f4140516e3d391f966c16ae05","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-262.254","next":"us/40-cfr-262.256"},"notice":"GroundRules: Original legal text. Not legal advice."}
