{"data":{"id":"us/40-cfr-262.260","jurisdiction":"us","citation":"40 CFR 262.260","heading":"Purpose and implementation of contingency plan.","body":"(a) A large quantity generator must have a contingency plan for the facility. The contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water.\n(b) The provisions of the plan must be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten human health or the environment.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER I—SOLID WASTES","PART 262—STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE","Subpart M—Preparedness, Prevention, and Emergency Procedures for Large Quantity Generators"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"e6245683f38645c1ffcd6c80b3c0874132586b6ecdd6981574753c5522c2e5de","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-262.256","next":"us/40-cfr-262.261"},"notice":"GroundRules: Original legal text. Not legal advice."}
