{"data":{"id":"us/40-cfr-262.263","jurisdiction":"us","citation":"40 CFR 262.263","heading":"Amendment of contingency plan.","body":"The contingency plan must be reviewed, and immediately amended, if necessary, whenever:\n(a) Applicable regulations are revised;\n(b) The plan fails in an emergency;\n(c) The generator facility changes—in its design, construction, operation, maintenance, or other circumstances—in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;\n(d) The list of emergency coordinators changes; or\n(e) The list of emergency equipment changes.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER I—SOLID WASTES","PART 262—STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE","Subpart M—Preparedness, Prevention, and Emergency Procedures for Large Quantity Generators"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"0e5e34606c0e0a50166434fce85d12065115d7536812a0f84ad966df29eb49b0","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-262.262","next":"us/40-cfr-262.264"},"notice":"GroundRules: Original legal text. Not legal advice."}
