{"data":{"id":"us/40-cfr-35.2212","jurisdiction":"us","citation":"40 CFR 35.2212","heading":"Project initiation.","body":"(a) The grantee shall expeditiously initiate and complete the project, in accordance with the project schedule contained in the grant application and agreement. Failure to promptly initiate and complete a project may result in the imposition of sanctions under 2 CFR 200.338.\n(b) The grantee shall initiate procurement action for building the project promptly after award of a Step 3 grant or, after receiving written approval of the information required under § 35.2202 under a Step 2 + 3 grant or, for a Step 7 project, after completing the facilities plan and the preparation of a pre-bid package that is sufficiently detailed to insure that the bids received form the design/build work will be complete, accurate, comparable and will result in a cost-effective operable facility. Public notice of proposed procurement action should be made promptly after Step 3 award or after final approvals for a Step 2 + 3 grant under § 35.2202, or after completing the pre-bid package for the Step 7 award. The grantee shall award the subagreement(s) and issue notice(s) to proceed, where required, for building all significant elements of the project within twelve months of the Step 3 award or final Step 2 + 3 approvals.\n(c) Failure to promptly award all subagreement(s) for building the project will result in a limitation on allowable costs. (See appendixes A, A.2.e.).\n(d) The grantee shall notify the Regional Administrator immediately upon award of the subagreement(s) for building all significant elem","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER B—GRANTS AND OTHER FEDERAL ASSISTANCE","PART 35—STATE AND LOCAL ASSISTANCE","Subpart I—Grants for Construction of Treatment Works"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"83d99b09fe38a2f8ac659dcb24a8cedfe75ac20767f086e224118d13d0ec636d","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-35.2211","next":"us/40-cfr-35.2214"},"notice":"GroundRules: Original legal text. Not legal advice."}
