{"data":{"id":"us/40-cfr-35.2250","jurisdiction":"us","citation":"40 CFR 35.2250","heading":"Determination of allowable costs.","body":"The Regional Administrator will determine the allowable costs of the project based on applicable provisions of laws and regulations, the scope of the approved project, 2 CFR part 200, subpart E—Cost Principles and appendix A of this subpart.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER B—GRANTS AND OTHER FEDERAL ASSISTANCE","PART 35—STATE AND LOCAL ASSISTANCE","Subpart I—Grants for Construction of Treatment Works"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"dbc691825e5fc4cd3788b306471208fca32a46a98fa751835d8f4e6bbf0d09c8","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-35.2218","next":"us/40-cfr-35.2260"},"notice":"GroundRules: Original legal text. Not legal advice."}
