{"data":{"id":"us/40-cfr-40.115-1","jurisdiction":"us","citation":"40 CFR 40.115-1","heading":"-1 Construction.","body":"May include the preliminary planning to determine the economic and engineering feasibility of a facility, the engineering, architectural, legal, fiscal, and economic investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other action necessary to the construction of a facility, the erection, acquisition, alteration, remodeling, improvement, or extension of a facility, and the inspection and supervision of the construction of a facility.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER B—GRANTS AND OTHER FEDERAL ASSISTANCE","PART 40—RESEARCH AND DEMONSTRATION GRANTS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"bdb3c22b63676dd6b717123a406f7afccb91414e8896f6f7c58903f8d62b6f0b","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-40.115","next":"us/40-cfr-40.115-2"},"notice":"GroundRules: Original legal text. Not legal advice."}
