{"data":{"id":"us/40-cfr-40.160-4","jurisdiction":"us","citation":"40 CFR 40.160-4","heading":"-4 Equipment report.","body":"As provided in 2 CFR 200.344 within 120 days of the completion or termination of a project, the grantee will submit a listing of all items of Equipment as defined at 2 CFR 200.1.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER B—GRANTS AND OTHER FEDERAL ASSISTANCE","PART 40—RESEARCH AND DEMONSTRATION GRANTS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"e149b0855d05d7f4ac512e6a39d14b71510c4cacffffda47a6d26c4bbd2eda85","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-40.160-3","next":"us/40-cfr-40.160-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
