{"data":{"id":"us/40-cfr-413.04","jurisdiction":"us","citation":"40 CFR 413.04","heading":"Standards for integrated facilities.","body":"Pretreatment standards for integrated facilities shall be computed as required by § 403.6(e) of EPA's General Pretreatment Regulations. In cases where electroplating process wastewaters are combined with regulated wastewaters which have 30 days average standards, the corresponding 30 day average standard for the electroplating wastewaters must be used. The 30 day average shall be determined for pollutants in the relevant subcategory from the corresponding daily and 4 day average values listed in the table below.\nIf the maximum for any 1 day is And the 4 day average is Then the 30 day average is\n0.6 0.4 0.3\n1.2 .7 .5\n1.9 1 .55\n4.1 2.6 1.8\n4.2 2.6 1.8\n4.5 2.7 1.8\n5.0 2.7 1.5\n7.0 4 2.5\n10.5 6.8 5\n20.0 13.4 10\n23 16 12\n47 29 20\n53 36 27\n74 39 21\n107 65 45\n169 89 49\n160 100 70\n164 102 70\n176 105 70\n273 156 98\n365 229 160\n374 232 160\n401 241 160\n410 267 195\n623 257 223\n935 609 445","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER N—EFFLUENT GUIDELINES AND STANDARDS","PART 413—ELECTROPLATING POINT SOURCE CATEGORY"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"7e5e0e0d5a5e0ea9a84739bb0e06143ec418ef0f254323def9db43d6d5e230c6","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-413.03","next":"us/40-cfr-413.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
