{"data":{"id":"us/40-cfr-45.140","jurisdiction":"us","citation":"40 CFR 45.140","heading":"Budget and project period.","body":"The budget and project periods for training awards will be specified in the terms of the awards as provided by 2 CFR 200.211.","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER B—GRANTS AND OTHER FEDERAL ASSISTANCE","PART 45—TRAINING ASSISTANCE"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"d6b35a8ab151a65c6fae8377a8027579dbd073ff4e20cef9291cd468355ffe86","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-45.135","next":"us/40-cfr-45.145"},"notice":"GroundRules: Original legal text. Not legal advice."}
