{"data":{"id":"us/40-cfr-52.2120","jurisdiction":"us","citation":"40 CFR 52.2120","heading":"Identification of plan.","body":"(a) Purpose and scope. This section sets forth the applicable State implementation plan (SIP) for South Carolina under section 110 of the Clean Air Act, 42 U.S.C. 7401-7671q and 40 CFR part 51 to meet national ambient air quality standards.\n(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to November 14, 2022, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after November 14, 2022, will be incorporated by reference in the next update to the SIP compilation.\n(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.\n(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to November 14, 2022, for South Carolina at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email fedreg.legal@nara.gov or go to http://www.archives.gov/federal-register/cfr/ibr-locations.html.\n(c) EPA-Approved Laws and Regulations.\nTable 1 to Paragraph (c)—EPA-Approved South Carolina Laws and Regulations\nState citation Title/subject State effective date EPA approval date Explanation\nRegulation No. 62.1 Definitions and General Requirements\nSection I Definitions 4/24/2020 10/28/2021, 86 FR 59641\nSection II Permit Requirements 6/24/2005 6/2/2008, 73 FR 31369 Except for Section II.L, approved on October 13, 2022 with a state effective date of September 23, 2016.\nSection III Emissions Inventory and Emissions Statement 4/24/2020 5/9/2022, 87 FR 27528\nSection IV Source Tests 6/27/2014 8/21/2017, 82 FR 39537\nSection V Credible Evidence 4/24/2020 5/9/2022, 87 FR 27528\nRegulation No. 62.2 Prohibition of Open Burning 12/27/2013 6/25/2018, 83 FR 29455\nRegulation No. 62.3 Air Pollution Episodes\nSection I Episode Criteria 4/26/2013 8/21/2017, 82 FR 39541\nSection II Emission Reduction Requirements 4/22/1988 10/3/1989, 54 FR 40659\nRegulation No. 62.4 Hazardous Air Pollution Conditions 12/20/1978 1/29/1980, 45 FR 6572\nRegulation No. 62.5 Air Pollution Control Standards\nStandard No. 1 Emissions from Fuel Burning Operations\nSection I Visible Emissions 9/23/2016 10/13/2022, 87 FR 62037\nSection II Particulate Matter Emissions 6/27/2014 6/25/2018, 83 FR 29455\nSection III Sulfur Dioxide Emissions 6/27/2014 6/25/2018, 83 FR 29455\nSection IV Opacity Monitoring Requirements 9/23/2016 9/18/2020, 85 FR 58283\nSection V Exemptions 5/24/1985 10/3/1989, 54 FR 40659\nSection VI Periodic Testing 6/27/2014 6/25/2018, 83 FR 29455\nStandard No. 2 Ambient Air Quality Standards 4/24/2020 9/30/2021, 86 FR 54105\nStandard No. 4 Emissions From Process Industries\nSection I General 2/28/1986 2/17/1987, 52 FR 4772\nSection II Sulfuric Acid Manufacturing 6/27/2014 6/25/2018, 83 FR 29455\nSection III Kraft Pulp and Paper Manufacturing Plants 6/27/2014 6/25/2018, 83 FR 29455\nSection V Cotton Gins 6/27/2014 6/25/2018, 83 FR 29455\nSection VI Hot Mix Asphalt Manufacturing 5/24/1985 10/3/1989, 54 FR 40659\nSection VII Metal Refining 2/28/1986 2/17/1987, 52 FR 4772\nSection VIII Other Manufacturing 6/24/2016 6/25/2018, 83 FR 29455\nSection IX Total Reduced Sulfur Emissions of Kraft Pulp Mills 9/23/2016 10/13/2022, 87 FR 62034\nSection X Non-Enclosed Operations 4/22/1988 7/2/1990, 55 FR 27226\nSection XI Total Reduced Sulfur Emissions of Kraft Pulp Mills 9/23/2016 10/13/2022, 87 FR 62037\nSection XII Periodic Testing 6/24/2016 6/25/2018, 83 FR 29455\nStandard No. 5 Volatile Organic Compounds\nSection I General Provisions\nPart A Definitions 4/26/2013 8/16/2017, 82 FR 38825\nPart B General Applicability 10/26/2001 5/7/2002, 67 FR 30594\nPart C Alternatives and Exceptions to Control Requirements 10/26/2001 5/7/2002, 67 FR 30594\nPart D Compliance Schedules 10/26/2001 5/7/2002, 67 FR 30594\nPart E Volatile Organic Compound Compliance Testing 6/26/1998 8/10/2004, 69 FR 48395\nPart F Recordkeeping, Reporting, Monitoring 10/26/2001 5/7/2002, 67 FR 30594\nPart G Equivalency Calculations 4/26/2013 8/16/2017, 82 FR 38825\nSection II Provisions for Specific Sources\nPart A Surface Coating of Cans 11/27/2015 8/16/2017, 82 FR 38825\nPart B Surface Coating of Coils 11/27/2015 8/16/2017, 82 FR 38825\nPart C Surface Coating of Paper, Vinyl, and Fabric 8/24/1990 2/4/1992, 57 FR 4158\nPart D Surface Coating of Metal Furniture and Large Appliances 8/24/1990 2/4/1992, 57 FR 4158\nPart E Surface Coating of Magnet Wire 10/26/2001 5/7/2002, 67 FR 30594\nPart F Surface Coating of Miscellaneous Metal Parts and Products 10/26/2001 5/7/2002, 67 FR 30594\nPart G Surface Coating of Flat Wood Paneling 2/25/1983 10/31/1983, 48 FR 50078\nPart H Graphic Arts—Rotogravure Flexography 2/25/1983 10/31/1983, 48 FR 50078\nPart N Solvent Metal Cleaning 10/26/2001 5/7/2002, 67 FR 30594\nPart O Petroleum Liquid Storage in Fixed Roof Tanks 2/25/1983 10/31/1983, 48 FR 50078\nPart P Petroleum Liquid Storage in External Floating Roof Tanks 2/25/1983 10/31/1983, 48 FR 50078\nPart Q Manufacture of Synthesized Pharmaceutical Products 4/26/2013 8/16/2017, 82 FR 38825\nPart R Manufacture of Pneumatic Rubber Tires 2/25/1983 10/31/1983, 48 FR 50078\nPart S Cutback Asphalt 6/13/1979 12/16/1981, 46 FR 61268\nPart T Bulk Gasoline Terminals and Vapor Collection Systems 2/25/1983 10/31/1983, 48 FR 50078\nStandard No. 5.2 Control of Oxides of Nitrogen (NOX) 6/25/2004 8/26/2005, 70 FR 50195\nStandard No. 7 Prevention of Significant Deterioration 11/26/2021 10/4/2023, 88 FR 68468\nStandard No. 7.1 Nonattainment New Source Review 11/26/2021 10/4/2023, 88 FR 68468 Except for the ethanol production facilities exclusion in paragraphs (A)(11)(t) and (B)(22)(c)(xx).\nRegulation No. 62.6 Control of Fugitive Particulate Matter\nSection I Control of Fugitive Particulate Matter in Non-Attainment Areas 11/27/2015 8/21/2017, 82 FR 39541\nSection II Control of Fugitive Particulate Matter in Problem Areas 5/24/1985 10/3/1989, 54 FR 40659\nSection III Control of Fugitive Particulate Matter Statewide 12/27/2013 8/21/2017, 82 FR 39541\nSection IV Effective Date 5/24/1985 10/3/1989, 54 FR 40659\nRegulation No. 62.7 Good Engineering Practice Stack Height\nSection I General 5/23/1986 5/28/1987, 52 FR 19858\nSection II Applicability 5/23/1986 5/28/1987, 52 FR 19858\nSection III Definitions and Conditions 5/23/1986 5/28/1987, 52 FR 19858\nSection IV Public Participation 5/23/1986 5/28/1987, 52 FR 19858\nRegulation No. 62.96 Nitrogen Oxides (NOX) Budget Program 1/25/2019 7/29/2020, 85 FR 45541\nRegulation No. 62.97 Cross-State Air Pollution Rule (CSAPR) Trading Program 8/25/2023 3/7/2025, 90 FR 11478\nRegulation No. 62.99 Nitrogen Oxides (NOX) Budget Program Requirements for Stationary Sources Not in the Trading Program 5/24/2002 6/28/2002, 67 FR 43546\nS.C. Code Ann Ethics Reform Act\nSection 8-13-100(31) Definitions 1/1/1992 8/1/2012, 77 FR 45492\nSection 8-13-700(A) and (B) Use of official position or office for financial gain; disclosure of potential conflict of interest 1/1/1992 8/1/2012, 77 FR 45492\nSection 8-13-730 Membership on or employment by regulatory agency of person associated with regulated business 1/1/1992 8/1/2012, 77 FR 45492\n(d) EPA-Approved State Source-Specific Requirements.\nTable 2 to Paragraph (d)—EPA-Approved South Carolina State Source-Specific Requirements\nName of source Permit No. State effective date EPA approval date Comments\nTranscontinental Gas Pipeline Corporation Station 140 2060-0179-CD 4/27/2004 4/23/2009, 74 FR 18471 This permit is incorporated in fulfillment of the NOx SIP Call Phase II requirements for South Carolina.\n(e) EPA-approved South Carolina non-regulatory provisions.\nProvision State effective date EPA approval date Explanation\nCherokee County Ozone Attainment Demonstration and Ten-year Maintenance Plan 6/26/1998 12/18/1998, 63 FR 70019\nCherokee County Ozone Ten Year Maintenance Plan 1/31/2002 4/26/2002, 67 FR 20647\nTransportation Conformity 10/24/2003 1/29/2004, 69 FR 4245\nAttainment Demonstration for the Appalachian, Catawba, Pee Dee, Waccamaw, Santee Lynches, Berkeley-Charleston-Dorchester, Low Country, Lower Savannah, Central Midlands, and Upper Savannah Early Action Compact Areas 6/25/2004 8/26/2005, 70 FR 50195\nSouth Carolina Transportation Conformity Air Quality Implementation Plan 11/19/2008 7/28/2009, 74 FR 37168\nCherokee County 110(a)(1) Maintenance Plan for the 1997 8-Hour Ozone Standard 12/13/2007 7/31/2009, 74 FR 26099\nSouth Carolina 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards 12/13/2007 07/13/2011, 76 FR 41111 For the 1997 8-hour ozone NAAQS.\nApplicability of Reasonably Available Control Technology for the Portion of York County, South Carolina 8/31/2007 11/28/11 76 FR 72844 Demonstration for Bowater Coated Paper Division; for Cytec Carbon Fibers; and for Georgia-Pacific—Catawba Hardboard Plant.\nNegative Declaration for Applicability of Groups I Control Techniques Guidelines for York County, South Carolina 8/31/2007 11/28/11 76 FR 72844 Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\nNegative Declaration for Applicability of Group II Control Techniques Guidelines for York County, South Carolina 8/31/2007 11/28/11 76 FR 72844 Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\nNegative Declaration for Applicability of Group III Control Techniques Guidelines for York County, South Carolina 2/23/2009 11/28/11 76 FR 72844 Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\nNegative Declaration for Applicability of Group IV Control Techniques Guidelines for York County, South Carolina 7/7/2009 11/28/11 76 FR 72844 Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\nSouth Carolina portion of bi-state Charlotte; 1997 8-Hour Ozone 2002 Base Year Emissions Inventory 4/29/2010 05/18/2012, 77 FR 29540 Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\nRegional haze plan 12/17/2007 6/28/2012 77 FR 38509.\nSouth Carolina portion of bi-state Charlotte; 1997 8-Hour Ozone Emissions Statement 4/29/2010 6/25/2012, 77 FR 37815 Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards 4/14/2008 8/1/2012, 77 FR 45494\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards 9/18/2009 8/1/2012, 77 FR 45494\n110(a)(1) and (2) Infrastructure Requirements for 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards Elements 110(a)(1) and (2) (E)(ii) and (G) 4/3/2012 8/1/2012, 77 FR 45494\n110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS 9/18/2009 10/11/2012, 77 FR 61727 EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS.\nYork County 1997 8-hour ozone reasonable further progress plan 08/31/07 10/15/12, 77 FR 62454 Original submission.\nUpdate for York County 1997 8-hour ozone reasonable further progress plan 4/29/10 10/15/12, 77 FR 62454 Original submission updated to include required 2008 VOC MVEB.\n1997 8-hour ozone Maintenance Plan for the South Carolina portion of the bi-state Charlotte Area June 1, 2011 12/26/12, 77 FR 75862 Applicable to the 1997 8-hour ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards 4/14/2008 4/12/2013, 78 FR 21845 Addressing element 110(a)(2)(D)(i)(II) prong 3 only\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards 9/18/2009 4/12/2013, 78 FR 21845 Addressing element 110(a)(2)(D)(i)(II) prong 3 only\n110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards 4/14/2008 5/7/2014, 79 FR 26149 Addressing prong 4 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards 9/18/2009 5/7/2014, 79 FR 26149 Addressing prong 4 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards 7/17/2012 3/2/2015, 80 FR 11138 With the exception of PSD permitting requirements for major sources of sections 110(a)(2)(C) and (J); interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II), and the visibility requirements of section 110(a)(2)(J).\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS 9/20/2011 3/18/2015 80 FR 14023 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS 7/17/2012 3/18/2015 80 FR 14023 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS 4/30/2014 3/18/2015 80 FR 14023 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only.\n2011 Base Year Emissions Inventory for the South Carolina portion of the bi-state Charlotte 2008 8-Hour Ozone Nonattainment Area 8/22/2014 6/12/2015 80 FR 33417\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS 7/17/2012 8/12/2015, 80 FR 48259 Addressing the visibility requirements of 110(a)(2)(J) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards 9/20/2011 9/24/2015, 80 FR 57541 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J).\n2008 8-hour ozone Maintenance Plan for the York County, South Carolina portion of the bi-state Charlotte Area 4/17/2015 12/11/2015, 80 FR 76867\nSouth Carolina Transportation Conformity Air Quality Implementation Plan 10/23/2015 4/5/2016, 81 FR 19498\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS 5/8/2014 5/24/2016, 81 FR 32652 With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS 4/30/2014 09/16/2016, 81 FR 63705 With the exception of sections 110(a)(2)(C), prong 3 of D(i), and (J) and sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4).\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS 12/14/2015 4/07/2017, 82 FR 16931 With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4).\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS 12/7/2016 10/3/2017, 82 FR 45995 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only.\nDecember 2012 Regional Haze Progress Report 12/28/2012 10/12/2017, 82 FR 47393\n110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS 7/17/2012 9/24/2018, 83 FR 48239 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS 4/30/2014 9/24/2018, 83 FR 48239 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS 5/8/2014 9/24/2018, 83 FR 48239 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS 12/18/2015 9/24/2018, 83 FR 48239 Addressing prong 4 of section 110(a)(2)(D)(i)(II) only.\nRegional Haze Plan Revision 9/5/2017 9/24/2018, 83 FR 48239\n110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS 12/14/2015 9/25/2018, 83 FR 48390 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS 6/25/2018 10/10/2019, 84 FR 54502 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS 6/18/2018 1/2/2020, 85 FR 7 Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.\n110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS 9/7/2018 2/6/2020, 85 FR 6810 With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2).\n110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS 9/7/2018 12/2/2021, 86 FR 68421 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only.\n1997 8-hour ozone Maintenance Plan for the Catawba Indian Nation portion of the bi-state Charlotte Area 7/7/2020 1/25/2022, 87 FR 3675 Applicable only to the Catawba Indian Nation Reservation portion within the 1997 8-hour ozone boundary in York County, South Carolina (within the Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area).\n2008 8-hour ozone Second 10-Year Maintenance Plan for the York County, South Carolina portion of the bi-state Charlotte Area 9/26/2023 11/20/2025, 90 FR 52248\nRegional Haze Plan—Second Planning Period 3/3/2022 12/11/2025, 90 FR 57636","path":["Title 40—Protection of Environment","CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY","SUBCHAPTER C—AIR PROGRAMS","PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS","Subpart PP—South Carolina"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-40.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:04Z","sha256":"bebeb6ee2a9cd95a8ebc4e3d36633379f310b8453c8cb543c0cf0f34932a4197","source_id":"us-cfr","stale":true,"prev":"us/40-cfr-52.2089","next":"us/40-cfr-52.2121"},"notice":"GroundRules: Original legal text. Not legal advice."}
